Key Milestones

Key Milestones

2014

Developed a GST and bunkering LNGC insulation panel

2013

Developed an HFC-245fa LNGC insulation panel (NO96-L3 and Mark III System)

2012

Developed an LNGC 400-mm insulation panel (CO2, HCFC-141b / Mark Ⅲ system)

2008

Developed an aerogel blanket insulator

2006

Developed a CO2 (water-blown) LNGC insulation panel

2005

Developed a CO2 (water-blown) LNGC insulation panel

2003

Developed Pipe cover system for LPG tank

Developed HCFC-free Spray system for LPG/LEG cryogenic insulation

Developed HCFC-free system for LNG Pipe cover (PIR,PUR)

2002

Developed a PIR system for construction panels

1998

Developed a CFC-free polyurethane foam for LNG tanks

1997

Developed a CFC LNGC insulation panel

Seach Dongsung Finetech International to see if we have what you're looking for!